Karakhan, A. A., Azeez, M., Shakouri, N.,
and Gambatese, J. (2026).
Safety
Constructability of Different Project
Delivery Methods on Construction Projects.
Journal of Engineering, Project, and Production Management,
16(8), 2024-83.
DOI:
10.32738/JEPPM-2024-83
Maseko, L., Rotimi, J. O. B., and Root, D. (2026).
Neuro-Inclusive
Safety Management in Construction:
Practitioner Perceptions of Cognitive and
Sensory Diversity.
Journal of Engineering, Project, and Production Management,
16(8), 2026-0135.
DOI:
10.32738/JEPPM-2026-0135