Home

  Editors

  Ethics

  Submission

  Volumes

  Indexing

  Copyright

  Fees

  Subscription

  Publisher

  Support

  EPPM

Journal of Engineering, Project, and Production Management, 2026, 16(8), 2026-0185

 

Perceived Artificial Intelligence Skill Demand Across the Construction Project Lifecycle: Evidence from the Rwandan Construction Industry

 

Oluwaseun Sunday Dosumu1, Christine Musanase2, Ryan Tumusiime Kaganga3, Dieudonne Ahishakiye4, and Eric Iradukunda5

1 Department Head, University of Rwanda College of Science and Technology, E-mail: o.dosumu@ur.ac.rw (corresponding author).
2 Researcher, Information Systems Department, University of Rwanda College of Science and Technology, E-mail: musanasechristine@gmail.com
3 Construction Professional, Department of Construction Economics and Management, University of Rwanda College of Science and Technology, E-mail: tumusiimeryan11@gmail.com
4 Quantity Surveyor, Department of Construction Economics and Management, University of Rwanda College of Science and Technology, E-mail: ahishadonne2002@gmail.com
5 Student, Department of Construction Economics and Management, University of Rwanda College of Science and Technology, E-mail: ericaca2021@gmail.com

 

Project Management

 

Received August 10, 2026; revised September 9, 2026, September 13, 2026; accepted September 15, 2026

 

Available online October 20, 2026

 

Abstract: Artificial Intelligence (AI) is increasingly transforming construction processes, yet limited empirical evidence exists on the skills required by professionals across different stages of the construction project lifecycle, particularly in developing economies. This study evaluates the perceived demand for AI skills across the eight stages of the Royal Institute of British Architects (RIBA) Plan of Work in the Rwandan construction industry. A quantitative cross-sectional survey was conducted among 174 construction professionals representing architecture, engineering, quantity surveying and construction management. Data were collected using a structured questionnaire measuring the perceived demand for AI-related skills across the eight lifecycle stages. Descriptive statistics were used to assess and rank skill demand, while the Kruskal-Wallis H test examined differences among professional groups, and the Friedman test assessed differences across lifecycle stages. The findings show moderate-to-high demand for AI skills across all lifecycle stages. The use stage recorded the highest overall demand, followed by strategic definition, and manufacturing and construction, while handover recorded the lowest. Significant differences across lifecycle stages were identified using the Friedman test (χ² = 19.162, p = 0.008), although the practical effect was very weak (Kendall's W = 0.016), indicating modest variation in relative intensity. Most individual skills did not differ significantly across professional groups, suggesting a substantial common set of AI competencies alongside selected discipline-specific requirements. The study’s findings provide evidence for the development of targeted, stage-specific construction education, professional development and workforce strategies in Rwanda and comparable developing economies.

 

Keywords: Artificial intelligence; AI skills; construction industry; construction project; project lifecycle; Rwanda.

Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal).

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.

Requests for reprints and permissions at eppm.journal@gmail.com.

Citation: Dosumu, O. S., Musanase, C., Kaganga, R. T., Ahishakiye, D., and Iradukunda, E. (2026). Perceived Artificial Intelligence Skill Demand Across the Construction Project Lifecycle: Evidence from the Rwandan Construction Industry. Journal of Engineering, Project, and Production Management, 16(8), 2026-0185.

DOI: 10.32738/JEPPM-2026-0185

Full Text


Copyright © EPPM-Journal. All rights reserved.