Home

  Editors

  Ethics

  Submission

  Volumes

  Indexing

  Copyright

  Fees

  Subscription

  Publisher

  Support

  EPPM

Volume 2 / Number 2 / July 2012

Editorial

Ko, C. H. (2012). Project and Production Management in the Construction Industry. Journal of Engineering, Project, and Production Management, 2(2), 56.
DOI: 10.32738/JEPPM.201207.0001

Project Management

Ibrahim, Y. M., Ibrahim, A. D., and Chindo, P. G. (2012). Determination of Optimum Frame Rates for Observation of Construction Operations from Time-Lapse Movies. Journal of Engineering, Project, and Production Management, 2(2), 57-65.
DOI: 10.32738/JEPPM.201207.0002

Dada, M. O. (2012). Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria. Journal of Engineering, Project, and Production Management, 2(2), 66-77.
DOI: 10.32738/JEPPM.201207.0003

Production Management

Lennartsson, M. and Björnfot, A. (2012). Production Resource Management in the Industrialised House-Building Supply Chain. Journal of Engineering, Project, and Production Management, 2(2), 78-87.
DOI: 10.32738/JEPPM.201207.0004

Project and Production Management

Kalsaas, B. T. (2012). The Last Planner System Style of Planning: Its Basis in Learning Theory. Journal of Engineering, Project, and Production Management, 2(2), 88-100.
DOI: 10.32738/JEPPM.201207.0005

Ko, C. H. and Chen, Y. C. (2012). Evaluating Production Time Buffer for Precast Fabrication. Journal of Engineering, Project, and Production Management, 2(2), 101-111.
DOI: 10.32738/JEPPM.201207.0006

 


Copyright © EPPM-Journal. All rights reserved.