![]() |
|
|
|
Journal of Engineering, Project, and Production Management, 2026, 16(4), 2025-222
Quality Management of Municipal Road Construction Projects Based on 5M1E Theory and Fuzzy Comprehensive Evaluation Method
1
Associate Professor, School of Urban Engineering, Wenhua College, Wuhan,
430074, China, E-mail:
Project Management
Received October 12, 2025; revised April 14, 2026; accepted April 20, 2026
Available online May 29, 2026
Abstract: In the quality management evaluation of Municipal Road Construction (MRC) projects, traditional methods often fall prey to influence from expert experience and fragmented evaluation dimensions. To address these issues, the study examines the urban secondary road Z Avenue project, which spans 2.8 km and took 320 days to complete, as the empirical case. Based on the Man, Material, Machine, Method, Measurement, and Environment (5M1E) theory, a system of quality influencing factors is developed, which includes six primary indicators: personnel, materials, machinery, methods, measurement, and environment, and 15 secondary indicators. The Fuzzy Comprehensive Evaluation (FCE) method, combined with the entropy weight analytic hierarchy process, is used to calculate the subjective and objective weights for evaluation. The results reveal that method, mechanism, and measurement are the core dimensions with the highest combined weights at the first level, with values of 0.2256, 0.2223, and 0.185, respectively. The FCE yields a comprehensive score of 7.605 points for the Z Avenue construction quality, indicating a level II classification and an overall sound quality. This study offers a multidimensional, quantitative framework for assessing the quality management of MRC projects, with significant practical value for enhancing construction quality control.
Keywords: 5M1E framework, entropy weight analytic hierarchy process (Entropy-AHP), fuzzy comprehensive evaluation, municipal road construction, quality management evaluation. Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal). This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License. Requests for reprints and permissions at eppm.journal@gmail.com. Citation: Huang, C. and Zhou, W. (2026). Quality Management of Municipal Road Construction Projects Based on 5M1E Theory and Fuzzy Comprehensive Evaluation Method. Journal of Engineering, Project, and Production Management, 16(4), 2025-222.
|