Home

  Editors

  Ethics

  Submission

  Volumes

  Indexing

  Copyright

  Fees

  Subscription

  Publisher

  Support

  EPPM

Journal of Engineering, Project, and Production Management, 2018, 8(2), 65-74

 

Identification and Classification of Factors Affecting the Performance of Building Supervisor Engineers for Construction Industry

 

S. Shahraki1, E. Saghatforoush2, and A. Z. Ravasan3

1MSc Student, Project, and Construction Management Department, Faculty of Engineering Sciences, Mehralborz Institute of Higher Education, Tehran. Iran, Email: shabnam0shahraki@gmail.com (corresponding author).

2Senior Lecturer, School of Construction Economics and Management, University of the Witwatersrand, Johannesburg-South Africa, Email: ehsan.saghatforoush@wits.ac.za

3Assistant Professor, Faculty of Information Technology, Mehralborz Institute of Higher Education, Tehran. Iran, Email: zare.ahad@gmail.com

 

Project Management

 

Received December 4, 2017; received revision February 16, 2018; accepted February 18, 2018

 

Available online June 19, 2018

 

Abstract: The construction industry is one of the main sources of economic growth and development all over the world. Thus, the success of these projects is very important. Construction projects are engaged with three main factors of time, cost, and quality. Among these three factors, quality is considered as one of the most significant competitive factors. An important factor in maintaining and controlling quality and reinforcement of buildings is continuous supervision. Building supervisor engineers play a key role in the supervision of constructions. Unfortunately, due to the significance of construction industry, the poor performance of supervisor engineers leads to poor quality of urban constructions. In Iran, several surveys have been conducted to review the causes for undesirable performance of engineers, among which 62% pointed to supervisor engineers as the main cause of undesirable performance. This issue somehow; points to the poor performance of supervisor engineers and low quality of the construction industry in Iran. In other words, various factors affect the performance of building supervisor engineers and supervisory process. Accordingly, in this study authors are to identify factors affecting the performance of supervisor engineers through Systematic Literature Review (SLR) method. Collected data are descriptively analyzed. 18 factors affecting the performance of building supervisor engineers are identified. Using the pattern analysis, these factors are classified into 4 groups of legal, ethical, technical, and economic. We used the NVivo software to simplify the pattern analysis process. This classification provides an appropriate context for improving these factors to enhance the performance of building supervisor engineers and increasing the quality of the construction projects.

 

Keywords: Construction industry, quality, supervision, supervisor engineer, affecting factors.

Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal).

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License.

Requests for reprints and permissions at eppm.journal@gmail.com.

Citation: Shahraki, S., Saghatforoush, E., and Ravasan, A. Z. (2018). Identification and Classification of Factors Affecting the Performance of Building Supervisor Engineers for Construction Industry. Journal of Engineering, Project, and Production Management, 8(2), 65-74.

DOI: 10.32738/JEPPM.201807.0002

Full text

 


Copyright © EPPM-Journal. All rights reserved.