Home

  Editors

  Ethics

  Submission

  Volumes

  Indexing

  Copyright

  Fees

  Subscription

  Publisher

  Support

  EPPM

Journal of Engineering, Project, and Production Management, 2013, 3(2), 74-84

 

Determining the Performance of Procurement Methods against Selection Criteria using Outranking - Satisfying Methodology

 

O. S. Okunlola1 and I. I. Johnson2

1Senior Lecturer, Department of Building, Obafemi Awolowo University, Ile-Ife, Nigeria. E-mail: sojo_uk@yahoo.com (Corresponding author).

2Professor, Department of Building, Obafemi Awolowo University, Ile-Ife, Nigeria. E-mail: iikpo@oauife.edu.ng

 

Project Management

 

Received August 17, 2012; received revisions October 2, 2012; October 25, 2012; November 28, 2012; accepted December 1, 2012

 

Available online January 25, 2013

 

Abstract: The need to develop a decision support system to determine the most appropriate procurement route for a building project led to the development of various theoretical models. One of the foremost techniques was the multi-attribute utility approach (MAUA). In this technique, the arithmetic mean (averaging) method was used to fix the utility factors relating the procurement routes to each criterion. In this paper, the averaging method was subjected to further analysis using the outranking-satisfying technique to determine the correctness of the results derived from the averaging method used to fix the utility factors in the use of MAUA. The results showed that there is a significant difference between the rank-order of procurement methods against selection criteria by averaging and outranking-satisfying techniques. The use of outranking-satisfying analysis revealed that, the use of arithmetic mean to determine the utility factors can lead to inappropriate association of procurement routes with differing utility coefficients.

 

Keywords: procurement method, selection criteria, utility factors, multi-attribute utility, outranking satisfying analysis.

Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal).

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License.

Requests for reprints and permissions at eppm.journal@gmail.com.

Citation: Okunlola, O. S. and Johnson, I. I. (2013). Determining the Performance of Procurement Methods against Selection Criteria using Outranking - Satisfying Methodology. Journal of Engineering, Project, and Production Management, 3(2), 74-84.

DOI:10.32738/JEPPM.201307.0004

Full text

 


Copyright © EPPM-Journal. All rights reserved.